Executed Project - UAE
Project | Rolex Tower |
Scope | MEP |
Work Description |
Residential and Offices Tower - Sheikh Zayed Road, Dubai - UAE Built Up Area: 78,400 m²
B+G+M+57+2 Tower and 4B+9+Roof Car Park with intersection bridge 1 Basement Technical Floor + 31 Floors Offices + 2 Floors Technical + 27 Floors Apartments
Engineering, Procurement, Installation & Commissioning of Complete MEP Works including Central Air Conditioning and Ventilation Systems, Plumbing and Drainage Systems, Fire Fighting System, Electrical Low Voltage and Low Current Systems
Cooling Load: District Cooling of 2200 TR total Cooling Load Connected Load: 6 Nos. MV Transformers of 1500 KVA each
|
Value AED | AED 60,686,278.04 |
Client | Ahmad Seddiqi and Sons |
Consultant | |
Main Contractor | |
Period | Mar-07 to May-10 |