Project | Ruwais Housing Complex |
Scope | MEP |
Work Description |
Residential Housing Complex, phase III package 11 - Ruwais, Abu Dhabi Built Up Area: 190,141 m2
8 Towers of 12 Floors each, 4 substations, chiller yard and External Works, lift lobby, corridors, electric room, tel room, stair cases, and garbage rooms
Engineering, Procurement, Installation & Commissioning of Complete MEP Works including HVAC Systems, Plumbing and Drainage Systems, Fire Fighting System, LPG, Garbage shoots, Electrical Medium Voltage and Low Voltage and Low Current Systems. MEP external networks under ground covering water supply, drainage, storm, irrigation, chilled water and fire fighting piping networks, street lighting, telephone ducts parking lots illumination and security gate barriers.
Cooling Load: 5 Water Cooled Chillers of 1263 TR each, Total 6,315TR Cooling Load Connected Load: 10 Transformers of 1500 KVA each, 2 Transformers of 2500 KVA each
|
Value AED | AED 190,000,000.00 |
Client | ADNOC - Abu Dhabi National Oil Company |
Consultant | |
Main Contractor | |
Period | Aug-11 to Jul-13 |
Executed Project - UAE